PT Eco Paper Indonesia
Overview
HIJAU is collaborating with one of Alkindo Group’s subsidiaries, PT Eco Paper Indonesia. Located in Subang, West Java, the company operates in paper production. The project began in November 2025.
Project Details
The rooftop solar PV installation at PT Eco Paper Indonesia has a capacity of 1,913.5 kWp. Through detailed calculations, the HIJAU team ensured that this capacity is adequate to meet the operational needs of PT Eco Paper Indonesia.
Challenges
This project presents its own challenges in the ongoing construction process. The tight and demanding schedule required the HIJAU team to coordinate closely with all parties to accelerate construction effectively while still adhering to proper safety standards and accuracy.
Our Solution
HIJAU demonstrated its efforts to carry out the solar PV installation process according to the predetermined schedule while maintaining construction safety and security standards. HIJAU is committed to continuously coordinating with all involved parties to ensure that the construction process proceeds without errors that could delay the installation timeline.
Result
Through this solar PV installation, PT Eco Paper Indonesia can contribute to environmental protection by reducing carbon emissions by up to 44,238 tons, equivalent to planting 70,781 trees. This initiative reflects PT Eco Paper Indonesia’s commitment to transitioning to environmentally friendly renewable energy.
About Project
Status
ON-PROGRESS
Location
Subang
Capacity
1,913.5 kWp
Carbon Reduction
44,238 CO2