PT Hyundai Motor Manufacturing Indonesia (HMMI) Phase 1
ON-PROGRESS
July 21, 2026
HIJAU 正与印度尼西亚现代汽车制造有限公司(HMMI)合作,在其位于西爪哇省芝卡朗制造工厂的摩托车停车棚区域建设屋顶太阳能光伏(PV)系统。作为印度尼西亚领先的汽车制造商之一,HMMI 正通过将可再生能源融入生产设施,进一步强化其对可持续制造的承诺。
716.8 kWp
容量
12,689 CO₂
碳
减排
PT HLI Green Power
COMPLETED
June 23, 2025
HIJAU is entrusted by PT HLI Green Power to support sustainable energy through the installation of rooftop and canopy solar PV systems.
7,144 kWp
容量
171,044 CO₂
碳
减排
PT Long Rich Indonesia
COMPLETED
June 16, 2025
HIJAU has partnered with PT Long Rich Indonesia, a footwear manufacturer based in Cirebon, West Java.
2,560 kWp
容量
45,551 CO₂
碳
减排
TCC Coffee Roastery
COMPLETED
January 23, 2026
HIJAU 通过为新的加工设施和办公空间提供全面的冷却系统解决方案,支持高端精品咖啡烘焙设施的建设。
32 TR
容量